Case Study: H+H Celcon

Brief

H+H Celcon were undertaking a complete strip out of their Borough Green site.

Solution

We have had an ongoing relationship with H+H Celcon for 20 years and undertaken a number of projects including platform installations and ongoing planned preventative on-site maintenance. We were engaged in this project to strip out the old machinery; manufacture and install platforms, walkways, guarding and staircases and continue to install the new machinery.

H+H Celcon provided general arrangement drawings of the various equipment and the proposed positions on site. We then further developed these so that access walkways and machine guarding could be installed allowing for safe access from one end of site to the other. Mindful of the fact that access and space on site would be restricted we provided a value engineering modular design whereby all structures were manufactured in kit-form and bolted together on site.

Main steel structures were painted, flooring & handrails were galvanised, and guarding was powder-coated yellow and black.

Outcome

57 tonnes of fabricated steelwork were installed in 6 weeks, working in conjunction with machine installation teams, electricians and civil engineering contractors to ensure the tight programme of works was satisfied.

 

Over the past 15 years K&G engineering have supported H+H UK at their Aircrete block plant near Sevenoaks. The K&G team have consistently provided a professional service, offering cost effective engineering solutions. H+H routinely call upon the K&G team to help with routine machine servicing, supplying exchange parts and machinery modifications.

Over the years K&G have completed various high value capital projects. The most recent being the design, supply and installation of several meters of machinery platforms. Manufactured to CE standards, the project was installed on time and in budget. Overall a good quality company that is competitive and easy to deal with.

Robert Wilson
Works Manager

Information

On-site installation

Mild Steel Fabrication

Engineering Facilities Management

K&G Case Study Images – H+H Celcon
K&G Case Study Images – H+H Celcon2
K&G Case Study Images – H+H Celcon3
K&G Case Study Images – H+H Celcon4
K&G Case Study Images – H+H Celcon5
K&G Case Study Images – H+H Celcon6
K&G Case Study Images – H+H Celcon7
K&G Case Study Images – H+H Celcon8
K&G Case Study Images – H+H Celcon9
K&G Case Study Images – H+H Celcon10
K&G Case Study Images – H+H Celcon11