Brief

To build an acid water recycling tank base frame with platforms.

Solution

We began the project by manufacturing the steel frame for the recycling tank in a bolted fish plate format for ease of transportation to site and galvanising. This was constructed at our workshops for Tate & Lyle to inspect and approve before being galvanised. The frame was then delivered to site and positioned onto the pre-built concrete pad where further strengthening welds were added to the frame. We then assisted with the positioning of the tank. Following positioning, we installed platforms and handrails that we had pre-manufactured in our workshops to the specifications provided by Tate & Lyle, having collaborated with them at all stages to ensure all health and safety requirements were met.

Outcome

We delivered a robust, high specification solutions giving Tate & Lyle an impressive addition to their production systems which is fully compliant with health and safety requirements.

Information

On-site Installation

Mild Steel Fabrication

Stainless Steel Fabrication

K&G Case Study Images – British Sugar_
K&G Case Study Images – British Sugar_2
K&G Case Study Images – British Sugar_3
K&G Case Study Images – British Sugar_4
K&G Case Study Images – British Sugar_5
K&G Case Study Images – British Sugar_6